📈 14.10 Optimize planning

Summary

groupoptimize

  • Milestone dates: 2022-03-18 to 2022-04-17
  • Build board

Capacity

Please order by From date:

Person From To Days
Ezekiel Apr 04 Apr 08 5

@m_frankiewicz will be at around 50% capacity for the next 12 weeks starting 2022-03-21.

Objectives (WIP)

  1. Completion of the DORA 4 Metrics APIs
  2. VSA backend date range rebuild
  3. VSA usability improvements that don't require BE support
  4. Feature work on our high usage areas
  5. Contribute to a larger frontend effort
  6. Preparing for breaking changes

Themes

  • 🏎 Performance
  • 🔒 Security
  • 😍 Usability
  • 📈 Customer Requests
  • 🏆 OKR
  • 🐛 Bug

Product Themes

Title Weight Theme Priority FE / BE
DORA4: API support for Change Failure Rate - Ba... (gitlab-org/gitlab#299407 - closed) 3 🏆 2 backend
GlTable: Add tooltips to provide more informati... (gitlab-org/gitlab-ui#1447 - closed) 3 🏆 3 frontend
Migrate `app/views/admin/users/_modals.html.ham... (gitlab-org/gitlab#344555 - closed) 3 ? 🏆 4 frontend
API support for Change Failure Rate - API and d... (gitlab-org/gitlab#355013 - closed) 2 🏆 2 backend
Group-level Productivity Analytics do not show ... (gitlab-org/gitlab#229716 - closed) 2 🐛 2 backend
[VSA] Let users know data is aggregating (gitlab-org/gitlab#352427 - closed) 2 🏆 1 frontend
[Documentation] [VSA] Prepare the aggregated ba... (gitlab-org/gitlab#355000 - closed) 2 🏆 3 backend
[Group Activity Analytics] All-numeric name cau... (gitlab-org/gitlab#331896 - closed) 1 🐛 3 backend
'./ee/spec/features/analytics/cycle_analytics/c... (gitlab-org/gitlab#216745 - closed) 1 🐛 2 backend
[Feature flag] Rollout of `new_graphql_keyset_p... (gitlab-org/gitlab#323730 - closed) 1 😍 3 backend
Investigation: Potential problems on the Insigh... (gitlab-org/gitlab#354512 - closed) 1 🏎 3 backend
Instance-level DevOps Adoption: Using direct li... (gitlab-org/gitlab#341125 - closed) 1 🐛 3 backend
Auditor cannot view value stream analytics in g... (gitlab-org/gitlab#354603 - closed) 1 🐛 2 backend
Auditor cannot view DevOps adoption Analytics (gitlab-org/gitlab#355529 - closed) 1 🐛 2 backend
Auditor cannot view Contribution analytics (gitlab-org/gitlab#355531 - closed) 1 🐛 2 backend
Auditor cannot view Productivity analytics (gitlab-org/gitlab#355532 - closed) 1 🐛 2 backend
Auditor cannot view Repository analytics at gro... (gitlab-org/gitlab#355533 - closed) 1 🐛 2 backend
Migrate to shared alert HAML partial in app/vie... (gitlab-org/gitlab#354581 - closed) ? 🏆 3 frontend

Research/Needs Weight 🕵

To-Do

  • Define an approximate scope for the coming release.
  • Apply appropriate labels to issues:
    • Priority
    • Department
    • Pricing Tier
  • Review the proposed scope with Engineering.
  • Review design objectives with UX.
  • Get feedback and estimates from Engineering, confirming scope for the release.
  • Final verification of issues scheduled for the release.
  • Present selected issues in the Manage Kickoff on the 17th!

Previous 14.9 <= => Next 15.0