docs(roadmap): sync beta.md with the W39 results

What

The weekly sync of docs/roadmap/beta.md for W39 (2026-09-21 – 2026-09-27), following the file's own ### Weekly sync workflow. The input is the W39 results note.

Stacked on !2921 (merged), which renames closed-beta.md to beta.md. Merge !2921 (merged) first. This MR targets its branch and retargets to main once it lands.

Area Change
Header, throughput, review queue W39: 157 merged, 57 releases, queue 44 → 32, oldest !1598 (closed) at 44 days
Scope table S30 16/25, S31 13/19, S32 17/20, S17 Phase 6 41/42 plus the new virtual upstream list plan (12/21), monolith/S07 8/14
Gate Still 1. Both of #1326 (closed)'s MRs merged, so it is open pending verification
Readiness readiness!85 merged 2026-09-21
Gantt Virtual bar counts, a bar for the upstream list plan, PREP marked merged, externally gated bars moved to the sync date

Two things to check

  • Dates now come from spine.md, so two passages in !2921 (merged) changed. unified-artifact-management!151 (merged 2026-09-23) records Public Beta 2026-10-06 and GA January 2027 (19.8) as firm. "spine.md carries no open-beta phase" and "GA early 2027, to be confirmed" are replaced with those dates. The sync workflow's Step 10 says not to add GA dates. This edit updates a date !2921 (merged) already added, and cites Product's source.
  • Two links to the S17 virtual upstream list plan are absolute URLs. The plan is on main, but !2921 (merged)'s branch is 152 commits behind main and does not have it, so relative links fail lychee. They can go back to relative links after a rebase.

This MR needs a rebase onto !2921 (merged). !2921 (merged) was rebased onto main and took review fixes on 2026-09-28, including the spine.md date handling this MR also touches. On rebase, take !2921 (merged)'s version of the stage dates, the GA row and the spine.md passage, and keep only the W39 figures here.

Related to #1416 (closed)

🤖 Generated with Claude Code

Edited by Jaime Martinez