Skip to content

Update workhorse gitalyclient dependency backport to 17.9

What does this MR do and why?

Backport !187768 (merged)

In gitaly!7753 (merged), Gitaly updated go-grpc to 1.71.1 to fix some issues (e.g. https://gitlab.com/gitlab-com/request-for-help/-/issues/2604 and https://gitlab.com/gitlab-com/request-for-help/-/issues/2599). In that MR, gitalyclient package is updated too. And the changes in that MR is backported to 17.9 in Gitaly in gitaly!7772 (merged).

Workhorse as a client using gitalyclient package should also be updated to take that changes. This MR works on backporting gitalyclient package update to 17.9 statble.

MR acceptance checklist

This checklist encourages us to confirm any changes have been analyzed to reduce risks in quality, performance, reliability, security, and maintainability.

  • This MR is backporting a bug fix, documentation update, or spec fix, previously merged in the default branch.
  • The MR that fixed the bug on the default branch has been deployed to GitLab.com (not applicable for documentation or spec changes).
  • This MR has a severity label assigned (if applicable).
  • Set the milestone of the merge request to match the target backport branch version.
  • This MR has been approved by a maintainer (only one approval is required).
  • Ensure the e2e:test-on-omnibus-ee job has either succeeded or been approved by a Software Engineer in Test.

Note to the merge request author and maintainer

If you have questions about the patch release process, please:

Edited by Mayra Cabrera

Merge request reports

Loading