Skip to content

CI: shift opam jobs starting time

Hugo Heuzard requested to merge nomadic-labs/tezos:hhugo-shift-opam-jobs into master

Context

Gitlab allows us to delay jobs. The MR delays opam jobs so that they do not start all a the same time.

The jobs taking longer (with the most opam deps) should start first to not delay to pipeline.

Fixes #3098 (closed).

Manually testing the MR

Checklist

  • Document the interface of any function added or modified (see the coding guidelines)
  • Document any change to the user interface, including configuration parameters (see node configuration)
  • Provide automatic testing (see the testing guide).
  • For new features and bug fixes, add an item in the appropriate changelog (docs/protocols/alpha.rst for the protocol and the environment, CHANGES.rst at the root of the repository for everything else).
  • Select suitable reviewers using the Reviewers field below.
  • Select as Assignee the next person who should take action on that MR
Edited by Hugo Heuzard

Merge request reports