Prepare separate internal operation results
Context
This is the first step to answer #2806 (closed).
This is some preparatory work, where things are copied, moved or deleted, so that it is more apparent what is used for external or internal operation results.
Checklist
-
Document the interface of any function added or modified (see the coding guidelines) -
Document any change to the user interface, including configuration parameters (see node configuration) -
Provide automatic testing (see the testing guide): no semantics changes, so existing tests still cover the modifications. -
For new features and bug fixes, add an item in the appropriate changelog ( docs/protocols/alpha.rst
for the protocol and the environment,CHANGES.rst
at the root of the repository for everything else): no new features. -
Select suitable reviewers using the Reviewers
field below. -
Select as Assignee
the next person who should take action on that MR
Edited by Nicolas Ayache