Closed
Milestone
expired on Sep 18, 2021
v0.5.0 experiment flow
Release that includes the experiment flow. This release requires
A hardware abstraction layer (control stack)- Example schedules
- a device object that manages parameters and generates configuration files.
- Integration with the measurement control using appropriate
gettables
andsettables
. - Return types of schedules.
- DOCUMENTATION - we lack a lot of it!
There are several related issue #66 (closed) #67 (closed) #68 #78 (closed) #79 (closed) #81 (closed) (and probably more)