Finalize backfill_bulk_import_trackers_project_id BBM
What does this MR do and why?
Finalize backfill_bulk_import_trackers_* BBMs
Addresses &11670
Following the re-queue and completion of !197155 (merged). Now is the time to finalize this batch background migration.
Batch Background Migration Completed Status
BBMs being part of last required stop (18.2)
We recommend that batched background migrations are finalized after all of the following conditions are met:
- The batched background migration is completed on GitLab.com
- The batched background migration was added in or before the last required stop. For example if 17.8 is a required stop and the migration was added in 17.7, the finalizing migration can be added in 17.9.
We can finalize these BBMs in 18.3.
References
MR acceptance checklist
Evaluate this MR against the MR acceptance checklist. It helps you analyze changes to reduce risks in quality, performance, reliability, security, and maintainability.
Edited by Tomasz Skorupa

