Make the 'package-and-qa' job wait for downstream 'Trigger:qa-test' job
What does this MR do?
In the omnibus-gitlab-mirror
pipelines, the Trigger:measure-memory
job can take some time (up to 40 minutes) to run, and that can lead the upstream gitlab-org/gitlab
job to timeout.
Since gitlab-org/gitlab
's schedule:package-and-qa
job is only interested in the result of the omnibus-gitlab-mirror
's Trigger:qa-test
job, this MR makes gitlab-org/gitlab
's schedule:package-and-qa
polls for omnibus-gitlab-mirror
's Trigger:qa-test
instead of the whole pipeline, so that the QA status would be reported as soon as Trigger:qa-test
passes/fails.
This should mitigate #33272 (closed).
Does this MR meet the acceptance criteria?
Conformity
- [-] Changelog entry
- [-] Documentation created/updated or follow-up review issue created
-
Code review guidelines -
Merge request performance guidelines -
Style guides - [-] Database guides
-
Separation of EE specific content
Performance and Testing
- Example of a failed
Trigger:qa-test
: https://gitlab.com/gitlab-org/gitlab/-/jobs/314866341 - Example of a successful
Trigger:qa-test
: TBD
Edited by Rémy Coutable