Add instrumentation classes for Jira usage metrics
What does this MR do and why?
Related to #409634 (closed).
This migrates two Jira usage metrics in Service Ping to instrumentation classes framework.
They have been subsequently removed from Gitlab::UsageData
, as they
are generated directly from instrumentation classes.
Screenshots or screen recordings
Screenshots are required for UI changes, and strongly recommended for all other merge requests.
Before | After |
---|---|
How to set up and validate locally
This is covered by RSpec tests, but can be validated manually by building the payload with ServicePing::BuildPayload.new.execute
and checking if the metrics are present.
MR acceptance checklist
This checklist encourages us to confirm any changes have been analyzed to reduce risks in quality, performance, reliability, security, and maintainability.
-
I have evaluated the MR acceptance checklist for this MR.
Edited by Piotr Skorupa