Skip to content

Planning: Editable front matter

Overview

The feature overview and high-level requirements are defined in the user story epic: &4119 (closed).

Design concept: &4119 (comment 390312837)

Requirements

As per the SSE group's User Story planning process we should do planning to providing clarity around requirements and a high-level technical solution for this user story.

Planning document: https://docs.google.com/document/d/1jNcXYgCdegfwDZai7wa4UM2BHeA6Ughmkxjb6Cc-Qu0/edit

Issues from planning

Rough diagram plan

Static_Site_Editor_Planning_-_Editing_Front_Matter

13.4 TODOs (MRX map to diagram above)

MR1-3 Could happen in any order but are pre-requisites for the latter two which should occur sequentially

13.5+ TODOs

  • Design and implement configuration approach (metadata for front_matter_controls.vue)
  • Update front_matter_controls.vue to consume configuration
Edited by Derek Knox