Update design pairs for FY27 Q3 and Q4

What does this MR do?

Rotates the Product Design Pairs schedule for the next six months: FY27 Q3 and Q4 (2026-08-01 → 2027-01-31).

How pairs were built

  • Roster: IC designers across Product Studios (Core DevOps/Data, PLG/Mon/Platform, Security, AI), Design Expression, and Design Strategy (Concept Architects + Craft Quotient). Excludes DesignOps, managers, and non-designer engineers. 34 designers → 17 pairs.
  • Fresh: no pair repeats the last three rotations (checked through FY27 Q1–Q2).
  • Time zones: paired for overlap using each designer's Slack timezone. All pairs are ≤1 hr apart except Veethika+Sascha (3.5 hr), Pedro+Alyssa (6 hr, strategic), and Ilonah+Sunjung (6 hr).

🤖 Generated with Claude Code

Edited by Taurie Davis

Merge request reports

Loading
Loading