Update longhorn to v105.2.0+up1.8.1 (main) (minor)
This MR depends on sylva-projects/sylva-elements/ci-tooling/ci-deployment-values!192 (merged)
This MR contains the following updates:
| Package | Update | Change |
|---|---|---|
| longhorn | minor |
105.1.1+up1.7.3 -> 105.2.0+up1.8.1
|
| longhorn-crd | minor |
105.1.1+up1.7.3 -> 105.2.0+up1.8.1
|
Configuration
-
If you want to rebase/retry this MR, check this box
This MR has been generated by Renovate Bot Sylva instance.
CI configuration couldn't be handle by MR description. A dedicated comment has been posted to control it.
If no checkbox is checked, a default pipeline will be enabled (capm3, or capo if capo label is set)