Show final result
If there is more than one unit to work on show a final result in the end summarizing what was done.
Projects
Success: 14
* name1
* name2 (skipped)
* name3
* ...
Failure: 2
* nameA (failure in: build)
* nameB (failure in: source)
If there is more than one unit to work on show a final result in the end summarizing what was done.
Projects
Success: 14
* name1
* name2 (skipped)
* name3
* ...
Failure: 2
* nameA (failure in: build)
* nameB (failure in: source)