Skip to content

TLS interoperability: test actual compiled master

Stanislav Židek requested to merge ep69/gnutls:interop-version into master

We were using wrong GnuTLS version for interop testing :(

  • TLS interoperability: test actual compiled master

Previously, system (fedora) version of GnuTLS was used in TLS interoperability tests.

Signed-off-by: Stanislav Zidek szidek@redhat.com

Checklist

  • Commits have Signed-off-by: with name/author being identical to the commit author
  • Code modified for feature
  • Test suite updated with functionality tests
  • Test suite updated with negative tests
  • Documentation updated / NEWS entry present (for non-trivial changes)
  • CI timeout is 2h or higher (see Settings/CICD/General pipelines/Timeout)

Reviewer's checklist:

  • Any issues marked for closing are addressed
  • There is a test suite reasonably covering new functionality or modifications
  • Function naming, parameters, return values, types, etc., are consistent and according to CONTRIBUTION.md
  • This feature/change has adequate documentation added
  • No obvious mistakes in the code
Edited by Stanislav Židek

Merge request reports