Optimize parallel distribution between live env tests
What does this MR do?
Related to: https://gitlab.com/gitlab-org/quality/team-tasks/-/issues/1227
Right now package
tests take significantly more time to complete (50+minutes) and at the same time create
tests complete way faster than other jobs (10 minutes per parallel job).
By making a more even parallel distribution, the overall qa stage runtime should be reduced from around 55minutes package
jobs takes to finish to about 25.
Check-list
-
Verify the change in all affected pipelines.
Edited by Andrejs Cunskis