Add a process to verify EP pipeline dashboards
From Draft to Ready
-
TODOs are removed -
The process was followed once from start to finish
Context
Closes #477 (closed)
What does this MR do and why?
Introduce a process to verify that our pipeline durations dashboards are accurate.
This process was carried out once in #480 (closed)
Edited by David Dieulivol