Bump gitlab-omnibus-builder version to 5.68.1
What does this MR do?
Bumps BUILDER_IMAGE_REVISION in gitlab-ci-config/variables.yml from 5.68.0 to 5.68.1 on 19-4-stable, staying on the 5.68 stable line.
Follows the same pattern as !9798 (merged), !9942 (merged) and !9602 (merged).
Note: the 5.68.1 tag may not exist yet in gitlab-org/gitlab-omnibus-builder. The pipeline is expected to fail until the tag is created and only needs a retry afterwards.
Related issues
Related https://gitlab.com/gitlab-org/omnibus-gitlab/-/work_items/10160+s
Related https://gitlab.com/gitlab-org/release/tasks/-/work_items/28133+s
Checklist
See Definition of done.
For anything in this list which will not be completed, please provide a reason in the MR discussion.
Required
- MR title and description are up to date, accurate, and descriptive.
- MR targeting the appropriate branch.
- Latest Merge Result pipeline is green. (Pending the
5.68.1builder tag.) - When ready for review, MR is labeled workflowready for review per the Distribution MR workflow.
- The UBT version and corresponding checksum hash have been updated and referenced in the merge request if applicable. (N/A)
- UBT EE pipeline (
Trigger:ee-package-ubt) is green
- UBT EE pipeline (
For GitLab team members
If you don't have access to this, the reviewer should trigger these jobs for you during the review process.
- The manual
Trigger:ee-packagejobs have a green pipeline running against latest commit.- To debug QA failures, refer to the Investigate QA failures section.
- If
config/softwareorconfig/patchesdirectories are changed, make sure thebuild-package-on-all-osjob within theTrigger:ee-packagedownstream pipeline succeeded. (N/A) - If you are changing anything SSL related, then the
Trigger:package:fipsmanual job within theTrigger:ee-packagedownstream pipeline must succeed. (N/A) - If CI configuration is changed, the branch must be pushed to
dev.gitlab.orgto confirm regular branch builds aren't broken.
Expected (please provide an explanation if not completing)
- Test plan indicating conditions for success has been posted and passes. (Pipeline green with the new builder image.)
- Documentation created/updated. (N/A, CI variable bump only)
- Tests added. (N/A, CI variable bump only)
- Integration tests added to GitLab QA. (N/A)
- Equivalent MR/issue for the GitLab Chart opened. (N/A)
- Validate potential values for new configuration settings. (N/A)