Bump exiftool to 13.59

What does this MR do?

Bumps exiftool from 13.44 to 13.59 (latest upstream release, 2026-05-27), matching the version already shipped by CNG in gitlab-org/build/CNG!3217 (merged). This keeps the Debian, UBI, nix, and Omnibus packages on the same exiftool version with the same patch.

Changes:

  • config/software/exiftool.rb: bump the pinned version from 13.44 to 13.59.
  • config/patches/exiftool/allowlist-types.patch: rebase the allowlist patch for 13.59 (13.59 added FIT to @fileTypes, new %fileTypeLookup entries, and changed lib/Image/ExifTool/AIFF.pm), reusing the equivalent patch already rebased by CNG (allow-only-tiff-jpeg-exif-strip.patch). Patch behavior is unchanged:
    • @fileTypes and @writeTypes are qw(JPEG TIFF)
    • %fileTypeLookup only contains JPEG, JPG, TIFF
    • lib/Image/ExifTool/AIFF.pm is deleted

The 13.59 source is already available in the mirror: https://gitlab.com/gitlab-org/build/omnibus-mirror/exiftool

Signed-off-by: psingh29 <psingh@gitlab.com>

Closes #10184 (closed)

Test plan

Using workhorse's arguments (-all= -tagsFromFile @ <allowlisted tags> -) on stdin:

Input Patched 13.59 expected
t/images/GPS.jpg (5 GPS tags) exit 0, valid JPEG, 0 GPS tags
t/images/PNG.png exit 1, Unknown file type

Checklist

See Definition of done.

For anything in this list which will not be completed, please provide a reason in the MR discussion.

Required

  • MR title and description are up to date, accurate, and descriptive.
  • MR targeting the appropriate branch.
  • Latest Merge Result pipeline is green.
  • When ready for review, MR is labeled workflowready for review per the Distribution MR workflow.

For GitLab team members

If you don't have access to this, the reviewer should trigger these jobs for you during the review process.

  • The manual Trigger:ee-package jobs have a green pipeline running against latest commit.
  • If config/software or config/patches directories are changed, make sure the build-package-on-all-os job within the Trigger:ee-package downstream pipeline succeeded.
  • If you are changing anything SSL related, then the Trigger:package:fips manual job within the Trigger:ee-package downstream pipeline must succeed.
  • If CI configuration is changed, the branch must be pushed to dev.gitlab.org to confirm regular branch builds aren't broken.

Expected (please provide an explanation if not completing)

  • Test plan indicating conditions for success has been posted and passes.
  • Documentation created/updated.
  • Tests added.
  • Integration tests added to GitLab QA.
  • Equivalent MR/issue for the GitLab Chart opened.
  • Validate potential values for new configuration settings. Formats such as integer 10, duration 10s, URI scheme[REDACTED]host:port may require quotation or other special handling when rendered in a template and written to a configuration file.
Edited by Pratik Singh

Merge request reports

Loading
Loading