[QUARANTINE] Verify Pipeline subscription with a group owned project when upstream project new tag pipeline finishes triggers pipeline in downstream project

What does this MR do?

Quarantines the test Verify Pipeline subscription with a group owned project when upstream project new tag pipeline finishes triggers pipeline in downstream project (https://gitlab.com/gitlab-org/gitlab/-/blob/master/qa/qa/specs/features/ee/browser_ui/4_verify/pipeline_subscription_with_group_owned_project_spec.rb#L59)

This test has been found by Confiner to have failed 3 times, which meets the threshold of 3 times.

  1. e2e:package-and-test-results
  2. e2e:package-and-test-results
  3. e2e:package-and-test-results

#376073 (closed)

(This MR was automatically generated by Confiner at 2022-10-01 02:00:56 UTC)