Draft: SPIKE: Import CSV for work items
What does this MR do and why?
Starting with Import CSV. Some restructuring will be necessary:
the current service class and worker:
- require a project, so we may need to restructure to take a namespace or project/group? (Though the work item creator service takes a project so maybe that's ok?)
- use an issuable framework, so we can pull out some common logic into csv base class
then there's importing flexibility for work item types and widgets.
Screenshots or screen recordings
Screenshots are required for UI changes, and strongly recommended for all other merge requests.
How to set up and validate locally
Numbered steps to set up and validate the change are strongly suggested.
MR acceptance checklist
This checklist encourages us to confirm any changes have been analyzed to reduce risks in quality, performance, reliability, security, and maintainability.
-
I have evaluated the MR acceptance checklist for this MR.
Related to #373906 (closed)
Edited by charlie ablett