Skip to content

Changed instances of nodes to sites in Geo documentation

Keelan Lang requested to merge docs-geo-nodes-to-sites into master

What does this MR do?

I have changed most instances of the word "node" to "site", or its appropriate plural or possessive. Some notable exceptions:

  1. I did not change any instances that were reference to /etc/gitlab/gitlab.rb text, which would need to be updated separately
  2. I did not change any names of values in /etc/gitlab/gitlab.rb, as this would break the file
  3. I did not change any references to nodes for other services/components, such as Patroni or Consul

If the reviewer could carefully double-check all of my changes to ensure that I didn't accidentally change anything I shouldn't have, that would be much appreciated.

Related issues

Author's checklist

If you are a GitLab team member and only adding documentation, do not add any of the following labels:

  • ~"frontend"
  • ~"backend"
  • ~"type::bug"
  • ~"database"

These labels cause the MR to be added to code verification QA issues.

Reviewer's checklist

Documentation-related MRs should be reviewed by a Technical Writer for a non-blocking review, based on Documentation Guidelines and the Style Guide.

  • If the content requires it, ensure the information is reviewed by a subject matter expert.
  • Technical writer review items:
    • Ensure docs metadata is present and up-to-date.
    • Ensure the appropriate labels are added to this MR.
    • Ensure a release milestone is set.
    • If relevant to this MR, ensure content topic type principles are in use, including:
      • The headings should be something you'd do a Google search for. Instead of Default behavior, say something like Default behavior when you close an issue.
      • The headings (other than the page title) should be active. Instead of Configuring GDK, say something like Configure GDK.
      • Any task steps should be written as a numbered list.
      • If the content still needs to be edited for topic types, you can create a follow-up issue with the docs-technical-debt label.
  • Review by assigned maintainer, who can always request/require the reviews above. Maintainer's review can occur before or after a technical writer review.
Edited by Keelan Lang

Merge request reports