Skip to content

Increase the deduplication TTL for future jobs

Bob Van Landuyt requested to merge bvl-fix-deduplication-in-future into master

With this, the expiry for the deduplication key will be the time the job was scheduled in the future + the configured deduplication time for the job.

This makes sure that we do not expire before the job has even started, which could happen for jobs scheduled in the future that aren't picked up immediately after they should have been.

Changelog: fixed

For #344089 (closed)

Edited by Bob Van Landuyt

Merge request reports