Add retry to ProjectExportWorker
requested to merge 342919-on-gitlab-com-the-projectexportworker-sidekiq-job-has-about-a-12-failure-rate into master
What does this MR do and why?
Add retry to the TreeSave call to the serializer.
This is to help address transient GCP timeout failures as noted in gitlab-com/gl-infra/production#5683 (comment 703134167)
MR acceptance checklist
This checklist encourages us to confirm any changes have been analyzed to reduce risks in quality, performance, reliability, security, and maintainability.
-
I have evaluated the MR acceptance checklist for this MR.
Related to #342919 (closed)
Edited by Doug Stull