Update dot style in DORA lead time graphs
What does this MR do?
Updates the DORA 4 lead time graphs (both project and group-level) to always render each data point with a blue dot. This makes it easier to see isolated data points on the graphs.
Screenshots
| Before | After |
|---|---|
![]() |
![]() |
Hover style
Updates
Since capturing the screenshots/GIF above, the dot size has been reduced from 12px to 8px, so the dots will render a bit smaller than what is shown above. Now they look like this:
Related to #329645 (closed)
Edited by Nathan Friend



