Skip to content

Project mirror data scheduling specs no longer rely on be_within to have the correct interval.

What does this MR do?

Are there points in the code the reviewer needs to double check?

Why was this MR needed?

Screenshots (if relevant)

Does this MR meet the acceptance criteria?

What are the relevant issue numbers?

Closes #3919 (closed)

Edited by Tiago Botelho

Merge request reports