Skip to content

Migrate note edited text spec to vue-test-utils

Vitaly Slobodin requested to merge vs-migrate-note-edited-text-to-vue-test into master

Title: Prepare note edited text for bv upgrade

This MR lays the groundwork for the BootstrapVue upgrade that will be done in this MR: !18913 (merged). Due to some changes in the BTooltip and BPopover components, some related tests started failing after the upgrade. Those tests need to be updated accordingly:

  • Migrate specs to use vue-test-utils
  • sync needs to be set to false
  • attachToDocument must be true

This MR focuses on upgrading the tests located in spec/frontend/notes/components/note_edited_text:

Why are these changes necessary?

  • The reason to migrate the tests to vue-test-utils is that it allows us to set the sync and attachToDocument properties.
  • The reason to set attachDocument to true is that the BTooltip and BPopover directives expect to be attached to a document object.
  • The reason to set sync to false is that otherwise, specs for components that use BTooltip or BPopover will fail with the following error:

TypeError: Cannot read property 'sync' of null

Screenshots

Does this MR meet the acceptance criteria?

Conformity

Availability and Testing

Merge request reports