Skip to content
Snippets Groups Projects

Add more information for pre and post

Merged Evan Read requested to merge eread/more-pre-post-content into master
All threads resolved!

What does this MR do?

Adds more content as a follow up to: !18664 (merged).

Author's checklist

Review checklist

All reviewers can help ensure accuracy, clarity, completeness, and adherence to the Documentation Guidelines and Style Guide.

1. Primary Reviewer

  • Review by a code reviewer or other selected colleague to confirm accuracy, clarity, and completeness. This can be skipped for minor fixes without substantive content changes.

2. Technical Writer

  • Optional: Technical writer review. If not requested for this MR, must be scheduled post-merge. To request for this MR, assign the writer listed for the applicable DevOps stage.

3. Maintainer

  1. Review by assigned maintainer, who can always request/require the above reviews. Maintainer's review can occur before or after a technical writer review.
  2. Ensure a release milestone is set and that you merge the equivalent EE MR before the CE MR if both exist.
  3. If there has not been a technical writer review, create an issue for one using the Doc Review template.

Merge request reports

Loading
Loading

Activity

Filter activity
  • Approvals
  • Assignees & reviewers
  • Comments (from bots)
  • Comments (from users)
  • Commits & branches
  • Edits
  • Labels
  • Lock status
  • Mentions
  • Merge request status
  • Tracking
  • Marius Bobin assigned to @eread and unassigned @mbobin

    assigned to @eread and unassigned @mbobin

  • Evan Read added 140 commits

    added 140 commits

    Compare with previous version

  • Evan Read changed milestone to %12.5

    changed milestone to %12.5

  • removed missed:12.4 label

  • Evan Read assigned to @mbobin and unassigned @eread

    assigned to @mbobin and unassigned @eread

  • Marius Bobin assigned to @axil and unassigned @mbobin

    assigned to @axil and unassigned @mbobin

  • Marius Bobin approved this merge request

    approved this merge request

  • Marius Bobin resolved all threads

    resolved all threads

  • Evan Read assigned to @rdickenson and unassigned @axil

    assigned to @rdickenson and unassigned @axil

  • Evan Read resolved all threads

    resolved all threads

  • Evan Read added 1 commit

    added 1 commit

    • 0499b8d6 - Apply suggestion to doc/ci/yaml/README.md

    Compare with previous version

  • Russell Dickenson approved this merge request

    approved this merge request

  • mentioned in commit 68e1d5f6

  • This merge request has been deployed to the GitLab.com environment gstg in GitLab auto-deploy version 12.5.201910281129-c46489109e4.63e0b58bce3.

    A list of all the deployed commits can be found here.


    :robot: If this message is incorrect, please create an issue in the Release Tools project.

  • This merge request has been deployed to the GitLab.com environment gprd-cny in GitLab auto-deploy version 12.5.201910281129-c46489109e4.63e0b58bce3.

    A list of all the deployed commits can be found here.


    :robot: If this message is incorrect, please create an issue in the Release Tools project.

  • added workflowcanary label and removed workflowstaging label

  • This merge request has been deployed to the GitLab.com environment gprd in GitLab auto-deploy version 12.5.201910281129-c46489109e4.63e0b58bce3.

    A list of all the deployed commits can be found here.


    :robot: If this message is incorrect, please create an issue in the Release Tools project.

  • added workflowproduction label and removed workflowcanary label

  • Please register or sign in to reply
    Loading