Fixes iteration spec that relies on dynamic dates

What does this MR do and why?

Fixes iteration spec that relies on dynamic dates

On the user_views_iteration_cadence_spec, an iteration factory is automatically created with dynamic dates (via x.weeks.ago). With the transition to 2025, the dates are displayed to account for the year switch:

  • Expectation: Dec 25 - Jan 1, 2025
  • Outcome: Dec 25, 2024 - Jan 1, 2025

Failure detail: https://gitlab.com/gitlab-org/gitlab/-/jobs/8799293533.

This commit updates the iteration factory to use fixed dates.

MR acceptance checklist

This checklist encourages us to confirm any changes have been analyzed to reduce risks in quality, performance, reliability, security, and maintainability.

  • This MR is backporting a bug fix, documentation update, or spec fix, previously merged in the default branch.
  • [-] The MR that fixed the bug on the default branch has been deployed to GitLab.com (not applicable for documentation or spec changes).
  • [-] This MR has a severity label assigned (if applicable).
  • [-] Set the milestone of the merge request to match the target backport branch version.
  • This MR has been approved by a maintainer (only one approval is required).
  • [-] Ensure the e2e:test-on-omnibus-ee job has either succeeded or been approved by a Software Engineer in Test.

Note to the merge request author and maintainer

If you have questions about the patch release process, please:

Edited by Mayra Cabrera

Merge request reports

Loading