Instrument `View on a roadmap` link on work items hierarchy widget
What does this MR do and why?
Adds tracking for View on a roadmap
link on work items hierarchy widget
Part of new epic experience
MR acceptance checklist
Please evaluate this MR against the MR acceptance checklist. It helps you analyze changes to reduce risks in quality, performance, reliability, security, and maintainability.
Screenshots or screen recordings
No visual changes
How to set up and validate locally
Numbered steps to set up and validate the change are strongly suggested.
Related to #473081 (closed)
Merge request reports
Activity
changed milestone to %17.4
assigned to @fguibert
added pipelinetier-1 label
1 Message CHANGELOG missing: If this merge request needs a changelog entry, add the
Changelog
trailer to the commit message you want to add to the changelog.If this merge request doesn't need a CHANGELOG entry, feel free to ignore this message.
Reviewer roulette
Category Reviewer Maintainer frontend @dftian
(UTC-10, 20 hours behind author)
@elwyn-gitlab
(UTC+12, 2 hours ahead of author)
Please refer to documentation page for guidance on how you can benefit from the Reviewer Roulette, or use the GitLab Review Workload Dashboard to find other available reviewers.
If needed, you can retry the
danger-review
job that generated this comment.Generated by
Dangeradded workflowin review label and removed workflowin dev label
@nradina Could you please review?
requested review from @nradina
Bundle size analysis [beta]
This compares changes in bundle size for entry points between the commits 7cea6b61 and 727c4cbb
Special assetsEntrypoint / Name Size before Size after Diff Diff in percent average 4.32 MB 4.32 MB - 0.0 % mainChunk 3.27 MB 3.27 MB - 0.0 %
Note: We do not have exact data for 7cea6b61. So we have used data from: 379d3cbb.
The intended commit has no webpack pipeline, so we chose the last commit with one before it.Please look at the full report for more details
Read more about how this report works.
Generated by
Dangeradded pipeline:mr-approved label
added pipelinetier-2 label and removed pipelinetier-1 label
Before you set this MR to auto-merge
This merge request will progress on pipeline tiers until it reaches the last tier: pipelinetier-3. We will trigger a new pipeline for each transition to a higher tier.
Before you set this MR to auto-merge, please check the following:
- You are the last maintainer of this merge request
- The latest pipeline for this merge request is pipelinetier-3 (You can find which tier it is in the pipeline name)
- This pipeline is recent enough (created in the last 8 hours)
If all the criteria above apply, please set auto-merge for this merge request.
See pipeline tiers and merging a merge request for more details.
- Resolved by Zack Cuddy
@fguibert changes look good!
- Resolved by Florie Guibert
requested review from @zcuddy
E2E Test Result Summary
allure-report-publisher
generated test report!e2e-test-on-gdk:
test report for 727c4cbbexpand test summary
+------------------------------------------------------------------+ | suites summary | +-------------+--------+--------+---------+-------+-------+--------+ | | passed | failed | skipped | flaky | total | result | +-------------+--------+--------+---------+-------+-------+--------+ | Govern | 71 | 0 | 0 | 0 | 71 | ✅ | | Create | 128 | 0 | 15 | 0 | 143 | ✅ | | Fulfillment | 2 | 0 | 0 | 0 | 2 | ✅ | | Data Stores | 31 | 0 | 1 | 0 | 32 | ✅ | | Package | 20 | 0 | 12 | 0 | 32 | ✅ | | Monitor | 8 | 0 | 0 | 0 | 8 | ✅ | | Verify | 44 | 0 | 2 | 0 | 46 | ✅ | | Manage | 1 | 0 | 1 | 0 | 2 | ✅ | | Plan | 73 | 0 | 0 | 0 | 73 | ✅ | | Release | 5 | 0 | 0 | 0 | 5 | ✅ | | Secure | 3 | 0 | 0 | 0 | 3 | ✅ | | Analytics | 2 | 0 | 0 | 0 | 2 | ✅ | +-------------+--------+--------+---------+-------+-------+--------+ | Total | 388 | 0 | 31 | 0 | 419 | ✅ | +-------------+--------+--------+---------+-------+-------+--------+
e2e-package-and-test:
test report for 727c4cbbexpand test summary
+-------------------------------------------------------------+ | suites summary | +--------+--------+--------+---------+-------+-------+--------+ | | passed | failed | skipped | flaky | total | result | +--------+--------+--------+---------+-------+-------+--------+ | Create | 270 | 0 | 34 | 0 | 304 | ✅ | | Plan | 82 | 0 | 9 | 0 | 91 | ✅ | +--------+--------+--------+---------+-------+-------+--------+ | Total | 352 | 0 | 43 | 0 | 395 | ✅ | +--------+--------+--------+---------+-------+-------+--------+
added pipelinetier-3 pipeline:run-e2e-omnibus-once labels and removed pipelinetier-2 label
Generated bygitlab_quality-test_tooling
.
Slow tests detected in this merge request. These slow tests might be related to this merge request's changes.Click to expand
Job File Name Duration Expected duration #7636289596 ee/spec/features/groups/work_items/work_item_spec.rb#L46
Work item for signed in user for epic work items on the work item route behaves like work items rolled up dates when feature flag is enabled when using inheritable dates when removing all children rolled up child dates 58.29 s < 50.13 s - A deleted user
added rspec:slow test detected label
removed pipeline:run-e2e-omnibus-once label
added this merge request to the merge train at position 2
mentioned in commit ea4b251d
added workflowstaging-canary label and removed workflowin review label
added workflowcanary label and removed workflowstaging-canary label
added workflowstaging label and removed workflowcanary label
added workflowproduction label and removed workflowstaging label
added releasedcandidate label
added releasedpublished label and removed releasedcandidate label