Clean up Toggle epic swimlanes
requested to merge gitlab-community/gitlab:418091-migrate-ee-app-assets-javascripts-boards-components-toggle_epics_swimlanes-vue-to into master
What does this MR do and why?
The migration of Toggle epic swimlanes was done in !129955 (merged) , this MR was made at the same time with the original intent to migrate, but now just includes some clean up of the component and tests.
Screenshots or screen recordings
Screenshots are required for UI changes, and strongly recommended for all other merge requests.
Before | After |
---|---|
Screen Recording 2023-07-14 at 11.18.00.mov | Screen Recording 2023-07-14 at 16.05.35.mov |
How to set up and validate locally
Numbered steps to set up and validate the change are strongly suggested.
- Go to issues board page on a project (eg. http://127.0.0.1:3000/flightjs/Flight/-/boards)
MR acceptance checklist
This checklist encourages us to confirm any changes have been analyzed to reduce risks in quality, performance, reliability, security, and maintainability.
-
I have evaluated the MR acceptance checklist for this MR.
Related to #418091 (closed)
Edited by James Rushford