Skip to content

Introduce new pipeline details header - part 4

Payton Burdette requested to merge 394768-new-pipeline-detail-header-pt4 into master

What does this MR do and why?

Fourth and final MR in the effort to build out the new pipeline details header. In this MR we remove the old code, feature flag, flag stubs and update the test coverage.

First MR: !120634 (merged)

Second MR: !121174 (merged)

Third MR: !122216 (merged)

Design can be found here #394768[Unbox-pipeline-detail-page.png]

Screenshots or screen recordings

Screenshot_2023-06-13_at_11.42.31_AM

How to set up and validate locally

  1. Visit a project
  2. Visit a pipeline
  3. View the header section

MR acceptance checklist

This checklist encourages us to confirm any changes have been analyzed to reduce risks in quality, performance, reliability, security, and maintainability.

Related to #394768 (closed)

Edited by Payton Burdette

Merge request reports