Moves Milestones and iterations back into the Plan category
What does this MR do and why?
Moves Milestones and Iterations into the Plan category to match the alignment specified in #405011 (closed)!
This moves them at both the group and the project level
Screenshots or screen recordings
Group | Project |
---|---|
How to set up and validate locally
- Ensure you're running on an EE instance so you can see iteations.
- Follow the steps to enable the new navigation
- Look at a project sidebar
- Look at a group Sidebar
MR acceptance checklist
This checklist encourages us to confirm any changes have been analyzed to reduce risks in quality, performance, reliability, security, and maintainability.
-
I have evaluated the MR acceptance checklist for this MR.
Related to #405011 (closed)
Edited by Sam Beckham