Mass Deprecation of Configure and Release Metrics
What does this MR do and why?
Since Configure and Release has merged into the Deploy stage, we are doing housekeeping on all metrics related to Configure and Release. This MR covers 35 metrics that had statuses changed from active
to removed
. Another MR will be introduced to change the group
and stage
assignments.
Screenshots or screen recordings
Screenshots are required for UI changes, and strongly recommended for all other merge requests.
How to set up and validate locally
Numbered steps to set up and validate the change are strongly suggested.
MR acceptance checklist
This checklist encourages us to confirm any changes have been analyzed to reduce risks in quality, performance, reliability, security, and maintainability.
-
I have evaluated the MR acceptance checklist for this MR.