Add per runner job timeout
What does this MR do?
Allows Runner owner, to define maximum timeout that can be set for a job handled by that Runner. If project-level timeout is bigger, then Runner-level timeout takes precedence.
Are there points in the code the reviewer needs to double check?
Requires EE changes - should be merged together with gitlab-ee!4649.
Why was this MR needed?
Screenshots (if relevant)
Runner edit form
Project CI/CD settings - Runner's details
Job page
Does this MR meet the acceptance criteria?
-
Changelog entry added, if necessary -
Documentation created/updated -
API support added -
Tests added for this feature/bug - Review
-
Has been reviewed by UX -
Has been reviewed by Frontend -
Has been reviewed by Backend -
Has been reviewed by Database
-
-
Conform by the merge request performance guides -
Conform by the style guides -
Squashed related commits together -
Internationalization required/considered -
End-to-end tests pass ( package-qa
manual pipeline job)
What are the relevant issue numbers?
Closes #43426 (closed)
Edited by Kamil Trzciński