WIP: Test Plan for Performance Monitoring
Test Plan
This is the test plan to setup and automate Performance Tests
Introduction
The following are the key things to be addressed in this Perf Monitoring effort:
-
Run duplicate tests in parallel x100 or etc - should be addressed in &422 (closed)
-
Enable Gitaly N+1 detector in staging ( Context: https://gitlab.slack.com/archives/C3ER3TQBT/p1549395473729500 )
-
Continuous GitLab QA - Enable Perf Testing in CI for staging. - should be addressed in &422 (closed)
-
Load Testing
- Provide a bunch of URLs to be load tested and measure the metrics
- artillery.io or gatling can be used.
Edited by Ramya Authappan