FY23 Q3 Foundations KR3: Work with development to break down north star into iterative deliverables that can be built, crafting a direction for the next 6 months
Background
See epic description
Goal
Iteratively scope out a north star concept into iterative deliverables that can be shipped over the course of ~6 months.
The approach
-
Collaborate with engineering to break down north star concept into monthly deliverables @nbrandt
Engineering Team
-
Work with product to align on next six months of deliverables @nbrandt
@cdybenko
- Broken down in &9044
Edited by Taurie Davis