Skip to content

Remove workflow::production label from Launch phase of pd-flow

Thomas Woodham requested to merge 1214-pd-flow-workflow-production into master

Why is this change being made?

Part of feedback received about revised product development flow. The workflow::production label is not intended for use on issues and does not articulate state. Rather, it's used to describe the location in which an MR has been deployed. Further, this has the possibility of becoming chaotic as it is possible for an issue to be both in production and not at the same time due to the very real possibility that issues can have multiple MRs.

This MR removes workflow::production from the revised Flow document.

Closes #10220 (closed)

Related issues

Author Checklist

  • Provided a concise title for the MR
  • Added a description to this MR explaining the reasons for the proposed change, per say-why-not-just-what
  • Assign this change to the correct DRI
    • If the DRI for the page/s being updated isn’t immediately clear, then assign it to one of the people listed in the "Maintained by" section in on the page being edited.
    • If your manager does not have merge rights, please ask someone to merge it AFTER it has been approved by your manager in #mr-buddies.
    • If the changes relate to any part of the project other than updates to content and/or data files please make sure to ping @gl-static-site-editor in a comment for a review and merge. For example changes to .gitlab-ci.yml, JavaScript/CSS/Ruby code or the layout files. (this requirement has been removed pending identification of a new DRI for the handbook)
Edited by Farnoosh Seifoddini

Merge request reports