Skip to content

updates to Production Change Lock (PCL) policy and changes for FY21

Steve Loyd requested to merge 2020-11-pcl-update into master

Why is this change being made?

Updating the PCL policy as well as the schedule for end of FY21.

Author Checklist

  • Provided a concise title for the MR
  • Added a description to this MR explaining the reasons for the proposed change, per [say-why-not-just-what][transparency]
  • Assign this change to the correct DRI

Test app: https://2020-11-pcl-update.about.gitlab-review.app/handbook/engineering/infrastructure/change-management/index.html#production-change-lock-pcl

Edited by Steve Loyd

Merge request reports