Why is this change being made?
Updated the incident response plan control language to align with updated control language proposed by the SOC2 Type 1 external auditor. Also updated the SOC2 mapping based on the updated Type 1 and Type 2 mapping.
Does this MR meet the acceptance criteria?
Assign to DRI
-
Did you assign this change to the correct DRI of the page or information you are changing?
Conformity
-
Added description to this MR explaining the reasons for the proposed change, per say-why-not-just-what