Skip to content

remove UTC

William Chia requested to merge remove-utc into master

According to the communication guide (point 9), we should use UTC for engineering, and Pacific Time for everything else.

The UTC time doesn't currently align to PT because it is currently Daylight savings time.

This MR removes the corresponding UTC time for when the Messaging Lead should be online.

Edited by William Chia

Merge request reports