M2: Initial capability release
Drafted with AI assistance; reviewed by @andunn.
Tracks milestone M2 of the plan epic. A merged MR advances a checkbox; this tracker closes only on maintainer review of the whole milestone.
A consumer can pin a version and trust it.
- A semver release is cut through the release lane
- The component is listed in the CI/CD Catalog and installable from it
- The tracked STIG release's path and version are single-sourced in the repository
- The demonstration consumes a released version under a working non-human identity, green end to end
- Bryan's review and approval obtained before the v1.3.0 tag is cut (no tagging without his eyes; recorded 2026-08-21)
Part of &1
Edited by Andrew Dunn