2023-03-20: Adding database_apdex_settings in ApplicationSetting

🔴 Depends on the completion of gitlab-org/gitlab!97087 (merged) 🔴

Production Change

Change Summary

gitlab-org/gitlab!97087 (merged) handles pausing the batched migration on Patroni SLIs going below SLOs, it needs an entry (database_apdex_settings) to be added in ApplicationSetting.

Commands to be run in the console

application_setting = ApplicationSetting.last

das_value = {
  prometheus_api_url: 'http://thanos-query-frontend-internal.ops.gke.gitlab.net:9090',
  apdex_sli_query: {
    main: "avg_over_time(gitlab_service_apdex:ratio_5m{env='gstg',environment='gstg',monitor='global',type='patroni'}[5m])",
    ci: "avg_over_time(gitlab_service_apdex:ratio_5m{env='gstg',environment='gstg',monitor='global',type='patroni-ci'}[5m])"
  },
  apdex_slo: {
    main: 0.999,
    ci: 0.999
  }
}

application_setting.update(database_apdex_settings: das_value)

Rollback commands

application_setting = ApplicationSetting.last
application_setting.update(database_apdex_settings: nil)

Change Details

  1. Services Impacted - Thanos, Batched background migration
  2. Change Technician - @praba.m7n
  3. Change Reviewer - @igorwwwwwwwwwwwwwwwwwwww
  4. Time tracking - unknown
  5. Downtime Component - none

Detailed steps for the change

Change Steps - steps to take to execute the change

Estimated Time to Complete (mins) - Should be in milli-seconds

Rollback

Rollback steps - steps to be taken in the event of a need to rollback this change

Estimated Time to Complete (mins) - Should be in milli-seconds

Monitoring

Key metrics to observe

  • Metric: Metric Name
    • Location: Dashboard URL
    • What changes to this metric should prompt a rollback: Describe Changes

Change Reviewer checklist

C4 C3 C2 C1:

  • Check if the following applies:
    • The scheduled day and time of execution of the change is appropriate.
    • The change plan is technically accurate.
    • The change plan includes estimated timing values based on previous testing.
    • The change plan includes a viable rollback plan.
    • The specified metrics/monitoring dashboards provide sufficient visibility for the change.

C2 C1:

  • Check if the following applies:
    • The complexity of the plan is appropriate for the corresponding risk of the change. (i.e. the plan contains clear details).
    • The change plan includes success measures for all steps/milestones during the execution.
    • The change adequately minimizes risk within the environment/service.
    • The performance implications of executing the change are well-understood and documented.
    • The specified metrics/monitoring dashboards provide sufficient visibility for the change.
      • If not, is it possible (or necessary) to make changes to observability platforms for added visibility?
    • The change has a primary and secondary SRE with knowledge of the details available during the change window.
    • The labels blocks deployments and/or blocks feature-flags are applied as necessary

Change Technician checklist

  • Check if all items below are complete:
    • The change plan is technically accurate.
    • This Change Issue is linked to the appropriate Issue and/or Epic
    • Change has been tested in staging and results noted in a comment on this issue.
    • A dry-run has been conducted and results noted in a comment on this issue.
    • The change execution window respects the Production Change Lock periods.
    • For C1 and C2 change issues, the change event is added to the GitLab Production calendar.
    • For C1 and C2 change issues, the SRE on-call has been informed prior to change being rolled out. (In #production channel, mention @sre-oncall and this issue and await their acknowledgement.)
    • For C1 and C2 change issues, the SRE on-call provided approval with the eoc_approved label on the issue.
    • For C1 and C2 change issues, the Infrastructure Manager provided approval with the manager_approved label on the issue.
    • Release managers have been informed (If needed! Cases include DB change) prior to change being rolled out. (In #production channel, mention @release-managers and this issue and await their acknowledgment.)
    • There are currently no active incidents that are severity1 or severity2
    • If the change involves doing maintenance on a database host, an appropriate silence targeting the host(s) should be added for the duration of the change.
Edited by Prabakaran Murugesan