Enable serve_pages_from_deployments feature flag
Production Change
Change Summary
This feature flag allows pages to serve content from the special bucket in the object storage. But this bucket is empty ATM, so this change actually doesn't do much on its own.
Change Details
- Services Impacted - List services
- Change Technician - DRI for the execution of this change
- Change Criticality - C1, C2, C3, C4
- Change Type - changeunscheduled, changescheduled
- Change Reviewer - DRI for the review of this change
- Due Date - Date and time (in UTC) for the execution of the change
- Time tracking - Time, in minutes, needed to execute all change steps, including rollback
- Downtime Component - If there is a need for downtime, include downtime estimate here
Detailed steps for the change
Pre-Change Steps - steps to be completed before execution of the change
Estimated Time to Complete (mins) - Estimated Time to Complete in Minutes
-
Pre-Change Step 1 -
Pre-Change Step 2 -
Pre-Change Step 3
Change Steps - steps to take to execute the change
Estimated Time to Complete (mins) - Estimated Time to Complete in Minutes
-
Change Step 1 -
Change Step 2 -
Change Step 3
Post-Change Steps - steps to take to verify the change
Estimated Time to Complete (mins) - Estimated Time to Complete in Minutes
-
Post-Change Step 1 -
Post-Change Step 2 -
Post-Change Step 3
Rollback
Rollback steps - steps to be taken in the event of a need to rollback this change
Estimated Time to Complete (mins) - Estimated Time to Complete in Minutes
-
Rollback Step 1 -
Rollback Step 2 -
Rollback Step 3
Monitoring
Key metrics to observe
- Metric: Metric Name
- Location: Dashboard URL
- What changes to this metric should prompt a rollback: Describe Changes
Summary of infrastructure changes
-
Does this change introduce new compute instances? -
Does this change re-size any existing compute instances? -
Does this change introduce any additional usage of tooling like Elastic Search, CDNs, Cloudflare, etc?
Summary of the above
Changes checklist
-
This issue has a criticality label (e.g. C1, C2, C3, C4) and a change-type label (e.g. changeunscheduled, changescheduled) based on the Change Management Criticalities. -
This issue has the change technician as the assignee. -
Pre-Change, Change, Post-Change, and Rollback steps and have been filled out and reviewed. -
Necessary approvals have been completed based on the Change Management Workflow. -
Change has been tested in staging and resultes noted in a comment on this issue. -
A dry-run has been conducted and results noted in a comment on this issue. -
SRE on-call has been informed prior to change being rolled out. (In #production channel, mention @sre-oncalland this issue.) -
There are currently no active incidents.
Edited by Vladimir Shushlin