Skip to content

Increase prod registry gc review time from 24h to 48h

João Pereira requested to merge jdrpereira-master-patch-62689 into master

What does this MR do?

This is a repetition of !2028 (merged), in advance of the weekend migrations for gitlab-com/gl-infra/production#7583 (closed) and https://gitlab.com/gitlab-com/gl-infra/production/-/issues/7620.

Author Check-list

Please read the Contributing document and once you do, complete the following:

  • Check if all of the following apply:
    • Assign to the correct reviewer per the contributing document
    • Apply the correct metadata per the contributing document
    • Link to related MRs for applying the changes on other environments
    • Link to related Chef changes
    • If necessary link to a Criticality 4 Change Request issue

Reviewer Check-list

  • Check if all of the following apply:
    • Reviewed the diff jobs to confirm changes are as expected
    • No changes shown in the diffs not associated with this MR - This may require a rebase or further investigation

Applier Check-list

  • Make sure there is no ongoing deployment for the affected envs before merging (see #announcements slack channel)
Edited by John Skarbek

Merge request reports