Plan Stage Category Review FY23Q4
Purpose of this issue
It is audit time According to our handbook, There are a maximum of 8 high-level categories per stage to ensure we can display this on our website and pitch deck. (Categories that do not show up on marketing pages show up here in italics and do not count toward this limit.)
For groups that have two or more categories, but not all categories in a stage, the group name must be a unique word or a summation of the categories they cover.
Group | Category | Maturity | DRI | Marketing (Y/N) |
---|---|---|---|---|
Project Management | Team Planning | Viable | @gweaver | Y |
Project Management | Planning Analytics | Minimal | @gweaver | N |
Product Planning | Portfolio Management | Viable | @amandarueda | Y |
Product Planning | Design Management | Viable | @amandarueda | Y |
Certify | Requirements Management | Minimal | @mmacfarlane | Y |
Certify | Quality Management | Minimal | @mmacfarlane | Y |
Optimize | Value Stream Management | Viable | @hsnir1 | Y |
Optimize | DevOps Reports | @hsnir1 | Y | |
Optimize | DORA | @hsnir1 | Y |
Action items (follow ups) from this issue
- MRs for proposal for category changes (add/remove/rename/consolidate), see example: Renames Users Category to User Profile (www-gitlab-com!100978 - merged)
- New group level direction pages, see example: https://about.gitlab.com/direction/create/editor/
-
There are currently more than 8 categories under plan - are all needed? - @mushakov -
Why is _Planning Analytics _ a non marketing category? - @gweaver -
Are we planning on investing in design management? If not, should it be a category? - @amandarueda -
Why is DevOps reports still a category? - @hsnir1 -
Where is the Dora category? - @hsnir1 -
Certify - do all the categories under certify make sense? Will every work item type be a category? - @mmacfarlane
Edited by Melissa Ushakov