Update integral interface phasedint
To run the tests on our servers, you will need temporary developer access to the repository. Please request access through the Gitlab UI or by contacting one of the maintainers.
What has been done:
- Updated the cpint interface to phasedint
- Added support for all test suite
ToDo-list
The boxes below need to be checked before merge review will start
- Testing
-
All tests pass -rcheckflag enabled insetup.py -
All tests pass -fbatchflag enabled insetup.py
-
- Versioning
-
Changelog.mdis up to date -
If merge into master: The patch number in parameters.F90andchangelog.mdis up to date
-
- Website (Needs to be done before merge)
-
Updates (if any) to the website have been added
-
- Update docker
-
Updates (if any) to the docker image have been added
-
- Compliance with style guide
Edited by Sarai Dery Folkestad