-
Dan Snow authored
288s will be valued on the original cost basis, not using the new method. We can keep the code in place, but should remove references to the unused valuation method
71d1eb9c
288s will be valued on the original cost basis, not using the new method. We can keep the code in place, but should remove references to the unused valuation method