Schedules counting as operations
This issue is here mostly to have something to refer to for a few FIXMEs in the code. Related meeting notes and dicussions can also be stored here.
!709 (merged) introduced loops, and part of the implementation was to allow operation to be Schedules. This had led to a few places where the type checker complains about method calls that exist on an Operation
but do not exist on a Schedule
. Because we plan to discuss the design and implementation of Operations, Gates, Schedules, these places have been marked with FIXMEs.