Skip to content

2 week planning sprint

Sit down walk throughs

  1. (Greg, Octavio, Rose) Transferring Lovable. To who? What things (logins). What do we need to know? Walk through 'Lovable' how to.
  2. (Greg, Octavio, Rose) Walk through / How to Hugging Face project. Include / List writeups.
  3. (Greg, Octavio Rose) Walk through conventions updating processes. Sit down and review conventions... any processes that others wouldn't.

Prepare / write up

For this stuff, point to the location of the items and make a list of links.

  1. Any logins, etc. Github connect to lovable, postgres, supabase.
  2. What documentation do you have? Make a list.
    • "How to Convention" paper and anything else that needs to get integrated for conventions.
    • Anything related to the GHG Convention. Things that we should include in convention documentation that aren't in there.
    • Anything involved in the previous AI work (the blog post).
    • ... anything else?
Edited by Greg Austic