Maneuver structure and schedule
Should provide a schedule of burns in RIC, VNC and inertial frame. These will need start and stop times for the EOMs to be correct.
-
Propulsion subsystem -
Maneuver in VNC frame -
Maneuver schedule -
Mass decrement on demand -
GMAT validation of a finite burn without mass decrement: unsure I set this up correctly. Hence the validation will be done against the item below -
Q-Law control for low thrust with mass decrement and validation from paper (and smd)cf. #82 -
Prevent obsolete gravity field code from being built, even with unvalidated
flag (that part of the code has been unmaintained for a while now). -
Add instantaneous maneuvers in addition to finite burns, cf #84 (closed)
Edited by Christopher Rabotin